|
Case Studies Go Green – and be more profitable by going for energy efficient equipment – and it may not cost you a thing! Installations are going on every week and here is just a selection of some recent jobs:-. In addition please take the time to view this short YouTube Video |
||||
|
This retailer decided to fit double glazed hinged doors, EC fans and LED lighting to his existing refrigeration during a store refit in early January 2013. He has reported like for like savings compared to last February of around £700 per month and is already contemplating fitting doors to his other Budgens Stores as soon as possible. |
Delta were asked to conduct a trial for Nisa and this site was selected, the store was cold and some of the refrigeration not working 100%. Delta fitted single glazed doors to all of the existing Arneg multidecks. |
|||
|
After this retailer had seen Gravesend he was very keen to get doors on his chillers. The store had a real issue with cold aisles and was in great need of doors to make the store more comfortable to shop. |
As part of a refit we were asked to fit double glazed doors to the existing Koxka MCC cases. Another major reason for fitting these was to improve the poor case lighting by fitting vertical LED. |
|||
|
Delta is proud to have assisted DCI Refrigeration in providing the most energy efficient refrigeration to the TSC Eco site. We supplied Costan Lion Glycol cabinets with double glazed hinged doors. |
This is the second store refit that Delta have carried out for this Musgrave retailer, we replaced some of the existing Costan cabinets with the new ECA listed Delta Osprey with double glazed doors. While on-site we refurbished the frozen food cabinets and added vertical LED lighting. This has transformed this store the retailer and his customers are very pleased with the end result. |
|||

Budgens Bedgrove
Nisa Gravesend
Nisa Borough Green
Budgens Bampton
Coop Chobham
Budgens, Peachcroft – Abingdon